Hi everyone,
I haven’t posted anything lately because, well, we’ve been doing nothing but waiting on this to get done. I’m so happy to say that the Land Survey and Topography just arrived (after a six week wait)!
The survey is required by the architect in order to start his work. We have to know where the treehouse structures will be placed so we can then provide this information to the well drilling company and septic system engineer to begin their work.
The architect now has the survey and is starting. I’ll post his progress as he provides us with drawings, plans, etc. Things should start moving on this now..thankfully! I really had hoped we would be well into the conceptual design by now, but we are where we are.
Happy New Year everyone! It’s going to be a great 2018!
Peter